Sunday, January 20, 2013

Tales from the Crpyt pt. 2

Hello all,

Here is an update on the crypt project. You can see a fair bit of detail as to how it all came together from the last update.

I hope you've enjoyed the latest installment! Plenty of work yet to go, but the plaster flooring really did take a long time. You can see how the segments came out, which should give you an idea of how much carving had to be done around the slabs. This was all done with a hobby saw for the larger chunks, but a craft knife for the majority of it (plenty of tiny angles just waiting to snap off). Still to go are some interior elements such as sarcophagi, bricks to drawn in the walls, and the paint job!

4 comments:

  1. Amazing work mate - the floor looks great!! I know just what I need this for. ;)

    Frank

    ReplyDelete
  2. Thanks for the feedback, guys!

    The mold should last a fair bit longer, I just have to be careful... let's see what you have planned Mr. Furt.

    ReplyDelete
  3. Looking very nice, great work!

    ReplyDelete